This post card was mailed in 1906, but the image is from an earlier year. In the 1890s commercial fishing on Lake Superior was feeding Duluth and the entire Midwest with major operators: A. Booth and Sons (whose sign is visible at the left), Lake Superior Fish Company, H. Christiansen and Sons.
Contributing Institution:
University of Minnesota Duluth, Kathryn A. Martin Library, Northeast Minnesota Historical Collections
The caption of this post card says Clear span, 400 feet; clear height, 136 feet; total height above water, 186 feet. This view shows the waterfront when it was warehouses and wharves, docks, railroad freight sheds and slips. This view is probably from Skyline boulevard which, at this time, would have been called Rogers' Boulevard. William Rogers was the first parks department commissioner. In December 1959 the Duluth City Council and Mayor E. Clifford Bork changed the name of Rogers parkway and Skyline Boulevard to Skyline Parkway.
Contributing Institution:
University of Minnesota Duluth, Kathryn A. Martin Library, Northeast Minnesota Historical Collections
The caption of this post card says The Aerial Bridge, Span 393 feet 9 inches, 135 feet high from water line. Cost $100,000. Entrance to Duluth-Superior Harbor. The white building at the left is the U.S. Army Corps of Engineers Building constructed in 1906.
Contributing Institution:
University of Minnesota Duluth, Kathryn A. Martin Library, Northeast Minnesota Historical Collections
The Chicago Shipbuilding Company of Chicago, a subsidiary of the American Shipbuilding Company, built the steamer William E. Cory for the Pittsburgh Steamship Company in 1904. The vessel dimensions are 569' X 56' X 31'. She sailed from Chicago on her maiden voyage August 12, 1905 bound for Duluth to load iron ore. The aerial bridge was new. Bids were opened March 25, 1901, but only one was received. The Duluth Canal Bridge Company was awarded the contract but abandoned the work. In February 1904, the Modern Steel Structural Company of Waukesha, Wisconsin was issued a contract. Work began July 20, 1904. On February 23, 1905, with local dignitaries at hand, the bridge was first operated. Regular service began the next day according to newspaper accounts. The city engineer's report for 1905 stated that the bridge was "completed and commenced operation on May 5, 1905, and a few problems were corrected in running the bridge over the next few days." The Aerial bridge was completed in February 1905. The aerial bridge transporter or gondola or transfer car roadway was 17 feet by 50 feet with sidewalks seven feet by 50 feet, the cabins were 30 feet long. The U.S. Army Corps of Engineers office building with flag above it was built in 1906. Also visible in the image are the National Biscuit Company 517 Lake Avenue South, Blanchet Hotel 520 Lake Avenue South, and Wieland Flats 502-512 St. Croix Avenue
Contributing Institution:
University of Minnesota Duluth, Kathryn A. Martin Library, Northeast Minnesota Historical Collections
Aerial bridge under construction; Wenisch and Bourgeault cut stone contractors sign; steamer exiting harbor through canal; light house on south pier near bridge
Contributing Institution:
University of Minnesota Duluth, Kathryn A. Martin Library, Northeast Minnesota Historical Collections