Spectators assess damage to the Chicago Great Western Railroad bridge during the flood of 1908. The mill and elevator can be seen in the background. The Zumbro River overflowed its banks in Rochester early on the morning of June 26, 1908.
Spectators are walking along the Chicago Great Western Railroad bridge assessing the damage from the flood waters. Much of the ground supporting the tracks has been washed away. The Zumbro River overflowed its banks in Rochester early on the morning of June 26, 1908.
People, standing on the College Street bridge, are looking at the flood waters and the sagging Chicago Great Western Railroad tracks after the flood of 1908. The Zumbro River overflowed its banks in Rochester early on the morning of June 26, 1908.
Spectators are watching the raging flood waters from the College (4th Street) Street bridge. The Chicago Great Western Railroad bridge is also visible After several days of drenching rains along the Zumbro River basin, the river overflowed its banks in Rochester early on the morning of early on June 26, 1908. The river rose at a rapid rate (four feet in 20 minutes) and did extensive damage to the business and residential sections of the city.
View is to the north from the Moorhead Manufacturing Company's Flour Mill on the Moorhead side of the river just south of the Main Ave bridge. The Main Ave bridge is visible in the foreground as is the Northern Pacific Railway Bridge weighed down with locomotives and box cars to keep the bridge from washing away. In the distance at left can be seen steam tractors parked on the North Bridge weighing it down. These tactics worked as no bridges were lost during the flood.
Flooding up to the Stillwater Lift Bridge and the Lowell Park gazebo in Stillwater, Minnesota. The Stillwater Lift Bridge is a vertical-lift bridge crossing the St. Croix River between Stillwater, Minnesota, and Houlton, Wisconsin. It first opened to traffic in 1931.
Spectators are seen watching the flood waters from the College (4th Street) Street bridge. The Riverside Livery is visible on the right. After several days of drenching rains along the Zumbro River basin, the river overflowed its banks in Rochester early on the morning of early on June 26, 1908. The river rose at a rapid rate (four feet in 20 minutes) and did extensive damage to the business and residential sections of the city.