Architectural blueprint for the original 1916 construction of the St. Paul Library's Saint Anthony Park Library, one of the three Carnegie Libraries built in St. Paul. Charles Hausler was St. Paul's first City Architect (1914-1923).
The photograph is taken from present day Market Street, looking towards Washington Street. Construction of the scaffolds and building cranes has begun. Construction continues on the third floor of the Minnesota Club.
Completed ceiling decoration in the then-Circulation Room of the Central Library of the Saint Paul Public Library. Windows look out to Market Street. Today this room is known as the Non-fiction Room.
The bedrock is exposed and being drilled, cut and removed from the construction site. Foundation walls are shown in their wood and metal frames. Various types of construction tools, including type of power-operated drill are shown.
The photograph is taken from the present day corners of Washington and 4th Streets. The entrance on the far left of the photograph is for the James J. Hill Reference Library. The entrance to the center of the photograph is for the Saint Paul Public Library.
Photograph is taken from present day 4th Street. The first floor of the library is almost complete. Various materials are seen around the foundation of the library. Frame work for a power lift, for moving building materials, is being constructed between the existing scaffolds.
The photograph is taken from an elevated position on present day Kellogg Boulevard. The roof work is complete. A moving cover is in place over the skylights. Most of the windows have frames and are being sealed. Near photo's center, a man works on scaffold suspended from roof. Also a bell sits to the right edge of the pile of building materials, although neither the Central Library nor any branch of the Saint Paul Public Library is known to have a bell.
The photograph is taken from present day 4th Street. Work continues on the main entrance to the Saint Paul Public Library. Some windows remain open for delivery or removal of building materials.
The photograph is taken from an elevated position on present day Kellogg Boulevard. A wooden staircase allows easy access to the second floor of the library. An advertisement on the barricade reads in part "Gordon Pure Fur?".
Photograph is taken from elevated position of present day Kellogg Boulevard. On the right side of the photograph is the James J. Hill Reference Library. Interior scaffolding and supports are visible for both library buildings.
Photograph is taken from an elevated position of present day Washington and 4th Streets. Foundation for the stair case and entrance of the library has begun. Workers present at the near corner between first and second floors (blurred), on the trusses just left of the photo's center and on the far right edge. Work on the roof of the James J. Hill Reference Library has begun.
Photograph is taken from an elevated position of present day Kellogg Boulevard, looking towards Washington and 4th Streets. The power lift has been extended to a further height to deliver building materials to the upper floors. Building bricks and aggregate for concrete are still present on the building site. Building cranes are almost obscured within the walls of the library. Note the addition of a service entrance to the James J. Hill Reference Library. The Cathedral of Saint Paul is visible in the upper left portion of the photograph.
Photograph is taken from an elevated position of present day Kellogg Boulevard, looking towards Washington and 4th Streets. The exterior walls for all four floors are now completed. Roof trusses are now being set in place. Cranes are still visible in the section of the library facing Washington Street, as is a worker with a wheelbarrow on top of the library. Frames for the windows are visible in the construction yard.
Photograph is taken from present day corners of Washington and 4th Streets. The exterior wall are completed. Work continues on the main entrances for both Saint Paul Public Library and James J. Hill Reference Library. A building cranes are still visible on site.
The photograph is taken from an elevated position on present day Kellogg Boulevard. Building materials are piled up in the worksite. Note the three horse drawn wagons on the building site.
Photograph is taken from an elevated position from the corner of present day Washington and 4th Streets. The exterior of the second floor is almost complete. Scaffolding and cranes have been raised in height to begin working of the third floor. A wooden frame arch support is now in place above what will be the main entrance to the library.
Photograph is taken from an elevated position from present day corner of Washington and 4th Streets. The first floor is enclosed and work on the second floor has begun. A power lift between the scaffolds in now complete and will move building materials to the upper floors. The part of the building on Kellogg Boulevard and Washington Street side, appears to have a rectangular open area. This opening will eventually house eight floors of metal stacks for library materials.
Photograph is taken from an elevated position from present day Market Street, looking towards Washington and 4th Streets. Construction materials fill the building site. Bricks can be seen on the workers scaffolding on the interior walls. The steam-powered engine (known as a "donkey engine") that operates the power lift can be seen to the left of the base of the lift. The lift makes use of a conveyor and chute. Note the octagonal shape workers scaffold on the 4th Street side of the building. Windows are being installed in the Minnesota Club. In the upper left of the photograph a horse and wagon can be seen on Kellogg Boulevard.
Photograph is taken from an elevated position from the corner of present day Washington and 4th Streets. The upper left portion of the photograph shows the interior and exterior walls of the James J. Hill Reference Library. The lighter color portion is the exterior wall, and the darker portion the interior wall.